Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/700
Title: Nahr El Fidar Bridge
Authors: Makhoul, Nisrine
Affiliations: Department of Civil and Environmental Engineering 
Keywords: Precast
Prestressed
Assessment
Subjects: Reconstruction
Issue Date: 2014
Part of: The 8th International Conference on Engineering and Technology Research
Start page: 1
End page: 8
Conference: International Conference on Engineering and Technology Research (8th : 24-25 April 2014 : Dubai, Emirates) 
Abstract: 
Nahr Al Fidar Bridge in Lebanon was built in 1972. Like all other bridges, the structure became deficient to carry nowadays increased truck loadings especially in a country where enforcement of law on overloads is not stringent. The bridge was already suffering and needed strengthening, hostilities could have been an opportunity and not a disaster for replacing the whole structure. This paper examines the structural bridge conditions as – built in 1972 and assesses its load carrying capacity and remaining durability as if it still exists. Solutions for retrofitting / building a new structure are finally proposed.
URI: https://scholarhub.balamand.edu.lb/handle/uob/700
Type: Conference Paper
Appears in Collections:Department of Civil and Environmental Engineering

Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.