Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/700
Title: Nahr El Fidar Bridge
Authors: Makhoul, Nisrine
Affiliations: Department of Civil and Environmental Engineering 
Keywords: Precast
Prestressed
Assessment
Subjects: Reconstruction
Issue Date: 2014
Part of: The 8th International Conference on Engineering and Technology Research
Start page: 1
End page: 8
Conference: International Conference on Engineering and Technology Research (8th : 24-25 April 2014 : Dubai, Emirates) 
Abstract: 
Nahr Al Fidar Bridge in Lebanon was built in 1972. Like all other bridges, the structure became deficient to carry nowadays increased truck loadings especially in a country where enforcement of law on overloads is not stringent. The bridge was already suffering and needed strengthening, hostilities could have been an opportunity and not a disaster for replacing the whole structure. This paper examines the structural bridge conditions as – built in 1972 and assesses its load carrying capacity and remaining durability as if it still exists. Solutions for retrofitting / building a new structure are finally proposed.
URI: https://scholarhub.balamand.edu.lb/handle/uob/700
Type: Conference Paper
Appears in Collections:Department of Civil and Environmental Engineering

Show full item record

Record view(s)

16
checked on Apr 23, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.