Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/700
DC FieldValueLanguage
dc.contributor.authorMakhoul, Nisrineen_US
dc.date.accessioned2020-12-23T08:35:18Z-
dc.date.available2020-12-23T08:35:18Z-
dc.date.issued2014-
dc.identifier.urihttps://scholarhub.balamand.edu.lb/handle/uob/700-
dc.description.abstractNahr Al Fidar Bridge in Lebanon was built in 1972. Like all other bridges, the structure became deficient to carry nowadays increased truck loadings especially in a country where enforcement of law on overloads is not stringent. The bridge was already suffering and needed strengthening, hostilities could have been an opportunity and not a disaster for replacing the whole structure. This paper examines the structural bridge conditions as – built in 1972 and assesses its load carrying capacity and remaining durability as if it still exists. Solutions for retrofitting / building a new structure are finally proposed.en_US
dc.format.extent8 p.en_US
dc.language.isoengen_US
dc.subjectPrecasten_US
dc.subjectPrestresseden_US
dc.subjectAssessmenten_US
dc.subject.lcshReconstructionen_US
dc.titleNahr El Fidar Bridgeen_US
dc.typeConference Paperen_US
dc.relation.conferenceInternational Conference on Engineering and Technology Research (8th : 24-25 April 2014 : Dubai, Emirates)en_US
dc.contributor.affiliationDepartment of Civil and Environmental Engineeringen_US
dc.description.startpage1en_US
dc.description.endpage8en_US
dc.date.catalogued2018-03-14-
dc.description.statusPublisheden_US
dc.identifier.OlibID178923-
dc.relation.ispartoftextThe 8th International Conference on Engineering and Technology Researchen_US
dc.provenance.recordsourceOliben_US
Appears in Collections:Department of Civil and Environmental Engineering
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.