Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/3641
Title: | Mechanical building systems of a multi-function building | Authors: | Helou, Gabriella El Bacha, Antoine El |
Advisors: | Haidar, Haissam | Subjects: | Buildings--Mechanical equipment | Issue Date: | 2017 | Abstract: | The study was conducted on the FAR BLDG project in Beirut. It consisted of water supply, drainage and the heating and ventilation air conditioning systems of the building. The report covers all the learning, experiences design and calculation in this building. The building profile differs in the type of use. Where the ground floor contains a restaurant, the first floor a hotel, the last floor an office and the roof a gym and a pool. The mechanical systems in these three flours are different in design and calculation. The National Plumbing Code is used for the plumbing system. The water supply system is a down feed system. The ASHAE standards are used for the HVAC in this building. The heating and ventilation air conditioning systems are a split system used in the ground and first floors while the second floor uses a ducted system. |
Description: | Includes bibliographical references (p. 61). Supervised by Dr. Haissam Haidar. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/3641 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.