Title: | Testing mitigation measures for a construction project using primavera | Authors: | Nafaa, Bassam Ghosn, Elias |
Advisors: | Amran, Mazen | Subjects: | Construction industry--Costs--Case studies Project management |
Issue Date: | 2015 | Abstract: | This report deals with the study of the mitigation of a construction project using Primavera P6. The project is Mar Boutros 41 Located in Mount Lebanon. The architectural and structural drawings were accomplished and given to us to study the cost estimation of the project. We estimated its cost and modeled the project on Primavera P6. The project is now under construction and we updated some activities. The programs used to accomplish this project were Primavera P6, AutoCAD 2015 and some Excel Sheets that we made. It includes Quantity Takeoff, Cost Estimation, Activities Descriptions, Rates of Productivities, Duration and Relationships, Primavera Schedule, Schedule Update and Mitigation Measures. |
Description: | Includes bibliographical references (p. 78). Supervised by Dr. Mazen Amran. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/2975 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.