Title: | Project management (cost estimation & planning) | Authors: | Chamchoum, Laurent | Advisors: | Fawaz, Samar | Subjects: | Project management Building--Cost control |
Issue Date: | 2015 | Abstract: | We were assigned to execute a project consisting of building a residence building and fence around the property. In addition, to calculating all quantities in order to prepare a detailed BOQ, we were asked to complete a schedule of the works CPM diagram and Gantt chart for the whole project by using Primavera P6. As well as a detailed cost estimate for all works included in the construction of the building from excavation to final finishes, unit prices required for all tasks. This report includes several information about all methods and assumption used in computing quantities, prices, and durations explained in details. The AutoCAD drawings comprise a detailed bill of quantities for the project, and CPM schedule and Gant chart. |
Description: | Includes bibliographical references (p. 25). Supervised by Dr. Samer Fawaz. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/2951 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.