Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/2951
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Fawaz, Samar | en_US |
dc.contributor.author | Chamchoum, Laurent | en_US |
dc.date.accessioned | 2020-12-23T14:32:34Z | - |
dc.date.available | 2020-12-23T14:32:34Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/2951 | - |
dc.description | Includes bibliographical references (p. 25). | en_US |
dc.description | Supervised by Dr. Samer Fawaz. | en_US |
dc.description.abstract | We were assigned to execute a project consisting of building a residence building and fence around the property. In addition, to calculating all quantities in order to prepare a detailed BOQ, we were asked to complete a schedule of the works CPM diagram and Gantt chart for the whole project by using Primavera P6. As well as a detailed cost estimate for all works included in the construction of the building from excavation to final finishes, unit prices required for all tasks. This report includes several information about all methods and assumption used in computing quantities, prices, and durations explained in details. The AutoCAD drawings comprise a detailed bill of quantities for the project, and CPM schedule and Gant chart. | en_US |
dc.description.statementofresponsibility | By Laurent Chamchoum | en_US |
dc.format.extent | vii, 25 p. :ill., tables ;30 cm | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | Project management | en_US |
dc.subject.lcsh | Building--Cost control | en_US |
dc.title | Project management (cost estimation & planning) | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Civil Engineering | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2015-02-02 | - |
dc.description.degree | MS in Civil Engineering | en_US |
dc.description.status | Published | en_US |
dc.identifier.ezproxyURL | http://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-Civ-178.pdf | en_US |
dc.identifier.OlibID | 158509 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.