Title: | Scheduling and cost control of a residential building using Primavera | Other Titles: | Scheduling & cost control of a residential building using Primavera | Authors: | Keserwani, Sami Ragheb, Wiam Moustapha, Amin |
Advisors: | Omran, Mazen Nazem | Subjects: | Structural engineering--Case studies Construction projects--Case studies Cost control |
Issue Date: | 2014 | Abstract: | This report includes a detailed calculation for quantities, cost, and duration for a residential building in North Lebanon. The criteria for calculating steel and concrete quantity are discussed in the report. The project contains a detailed description of plans (structural and architectural), sections and elevations of the building. In addition to that, is to manage the project by creating a logic relationship among the activities and arranging these activities in a suitable sequence by using the program Primavera 6.0.Moreover, in our project we take into consideration safety issues and rules that should be apply during construction phase. |
Description: | Includes bibliographical references (p. 152). Supervised by Dr. Mazen Omran. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/2945 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.