Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/2945
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Omran, Mazen Nazem | en_US |
dc.contributor.author | Keserwani, Sami | en_US |
dc.contributor.author | Ragheb, Wiam | en_US |
dc.contributor.author | Moustapha, Amin | en_US |
dc.date.accessioned | 2020-12-23T14:32:31Z | - |
dc.date.available | 2020-12-23T14:32:31Z | - |
dc.date.issued | 2014 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/2945 | - |
dc.description | Includes bibliographical references (p. 152). | en_US |
dc.description | Supervised by Dr. Mazen Omran. | en_US |
dc.description.abstract | This report includes a detailed calculation for quantities, cost, and duration for a residential building in North Lebanon. The criteria for calculating steel and concrete quantity are discussed in the report. The project contains a detailed description of plans (structural and architectural), sections and elevations of the building. In addition to that, is to manage the project by creating a logic relationship among the activities and arranging these activities in a suitable sequence by using the program Primavera 6.0.Moreover, in our project we take into consideration safety issues and rules that should be apply during construction phase. | en_US |
dc.description.statementofresponsibility | By Sami Keserwani, Wiam Ragheb, Amin Moustapha | en_US |
dc.format.extent | xviii, 152 p. :ill., tables ;30 cm | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | Structural engineering--Case studies | en_US |
dc.subject.lcsh | Construction projects--Case studies | en_US |
dc.subject.lcsh | Cost control | en_US |
dc.title | Scheduling and cost control of a residential building using Primavera | en_US |
dc.title.alternative | Scheduling & cost control of a residential building using Primavera | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Civil Engineering | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2014-08-26 | - |
dc.description.degree | MS in Civil Engineering | en_US |
dc.description.status | Published | en_US |
dc.identifier.ezproxyURL | http://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-Civ-172.pdf | en_US |
dc.identifier.OlibID | 155166 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.