Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/3041
Title: | Bridge design | Authors: | Toubi, Mahmoud Fawaz, Ibrahim |
Advisors: | Gergess, Antoine | Subjects: | Bridges--Design and construction | Issue Date: | 2011 | Abstract: | This project consists of the design of a bridge structure according to AASHTO LRFD bridge design specifications. The bridge, which connects Beirut to Saida (already constructed after the July 2006 war), is made of precast, prestressed girders with a cast-in-situ deck on top. The main objective of this project is to propose a more economical solution compared to the existing solution based on AASHTO LRFD and specific requirements for the project by the relevant authorities. As the bridge is located near the sea, the service load tensile stress limit in the precast girder section is set at zero (extremely aggressive conditions) in order to avoid cracks in concrete and to avoid corrosion of steel. |
Description: | Includes bibliographical references (p. 78). Supervised by Dr. Antoine N. Gergess. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/3041 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.