Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/2943
Title: | Effects of fast tracking and resource leveling on a project | Authors: | Jamaleldine, Ammar Ferri, Ahmad |
Advisors: | Omran, Mazen Nazem | Subjects: | Construction projects--Case studies Concurrent engineering--Case studies Project management |
Issue Date: | 2014 | Abstract: | The purpose of this project is to demonstrate the effects of fast-tracking and resource leveling on a project. The building consists of four stories; each level is divided into two apartments and its located in Nakhleh Al koura, North Lebanon. The estimation of quantities was based on shop drawings and the estimation of rate of productivity was based on on-site surveys. The results will show that there are several paths to execute a project and an engineer has to choose the optimum path that meets the projects constraints. |
Description: | Includes bibliographical references (p. 58). Supervised by Dr. Mazen Omran. |
URI: | https://scholarhub.balamand.edu.lb/handle/uob/2943 | Rights: | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | Ezproxy URL: | Link to full text | Type: | Project |
Appears in Collections: | UOB Theses and Projects |
Show full item record
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.