Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/2886
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Omran, Mazen Nazem | en_US |
dc.contributor.author | Dandashi, Abdul Rahman | en_US |
dc.contributor.author | Eid, Abdul Kader | en_US |
dc.date.accessioned | 2020-12-23T14:32:21Z | - |
dc.date.available | 2020-12-23T14:32:21Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/2886 | - |
dc.description | Includes bibliographical references (p. 58). | en_US |
dc.description | Supervised by Dr. Mazen Omran. | en_US |
dc.description.abstract | In fast tracked project, a start to start relationship with lag is used between the construction activities when scheduling the total project activities. This may result in delays and additional cost due the presence of different crews in the same space due to the different rates of production. This problem cant be illustrated in Critical Path Method (CPM) method as such as primavera software. A line of balance analysis is required to detect such problems and purpose proper mitigation measure. For that a study case analyses have been done to explain and examine this problem to give suitable and innovative solutions to reduce as much as possible the money and time loss. | en_US |
dc.description.statementofresponsibility | by Abdul Rahman Dandashi, Abdul Kader Eid | en_US |
dc.format.extent | xi, 58 p. :ill., tables ;30 cm | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | House construction | en_US |
dc.subject.lcsh | Line of balance (Management)--Case studies | en_US |
dc.title | Line of balance application on a residential building | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Civil Engineering | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2016-01-27 | - |
dc.description.degree | MS in Civil Engineering | en_US |
dc.description.status | Published | en_US |
dc.identifier.ezproxyURL | http://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-Civ-213.pdf | en_US |
dc.identifier.OlibID | 165259 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.