Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/4025
DC FieldValueLanguage
dc.contributor.advisorHassan, Moustapha Elen_US
dc.contributor.authorNader, Ninaen_US
dc.date.accessioned2020-12-23T14:39:56Z-
dc.date.available2020-12-23T14:39:56Z-
dc.date.issued2020-
dc.identifier.urihttps://scholarhub.balamand.edu.lb/handle/uob/4025-
dc.descriptionIncludes bibliographical references (p. 132-136).en_US
dc.description.abstractIn the scope of generating clean energy locally and providing power coverage to small rural areas of Lebanon, far from the main power plants, using their natural local resources, it is found that the design of a mini-hydraulic power plant on one of the streams, Fnaideq stream, providing between 122 kW and 368 kW of electrical power, according to a specific flow rate and under a water gross head of roughly 130m, costing around 345000{dollar} only is a great initiative. This project presents data collection about different small streams in North Lebanon, the design of a local hydraulic power plant at the Fnaideq Stream, a detailed cost study along with a software application. As a crucial note, the design project is completed in a way to have the least amount of ecological and touristic impact on the region. The ecological footprint, the cost of building and installation, and the effect on the locals lives and properties are all factors that the project will aim to balance in order to provide a good power generation while having a minimal negative impact on the surroundings.en_US
dc.description.statementofresponsibilityby Nina Naderen_US
dc.format.extentxiv, 161 p. :ill., tables ;30 cm +1 CD-Rom (4 ¾ in.)en_US
dc.language.isoengen_US
dc.rightsThis object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holderen_US
dc.subject.lcshHydrolectric power plants--Lebanonen_US
dc.subject.lcshRenewable energy sourcesen_US
dc.subject.lcshDissertations, Academicen_US
dc.subject.lcshUniversity of Balamand--Dissertationsen_US
dc.titleMini-hydropower plant : a feasibility study in North Lebanonen_US
dc.typeThesisen_US
dc.contributor.departmentDepartment of Electrical Engineeringen_US
dc.contributor.facultyFaculty of Engineeringen_US
dc.contributor.institutionUniversity of Balamanden_US
dc.date.catalogued2020-01-24-
dc.description.degreeMS in Electrical Engineeringen_US
dc.description.statusUnpublisheden_US
dc.identifier.OlibID248487-
dc.rights.accessrightsThis item is under embargo until end of year 2022.en_US
dc.provenance.recordsourceOliben_US
Appears in Collections:UOB Theses and Projects
Show simple item record

Record view(s)

125
checked on Nov 24, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.