Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/3465
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Gerges, Najib N. | en_US |
dc.contributor.author | Sleiman, Nancy | en_US |
dc.contributor.author | Azar, Salim Al | en_US |
dc.date.accessioned | 2020-12-23T14:36:13Z | - |
dc.date.available | 2020-12-23T14:36:13Z | - |
dc.date.issued | 2011 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/3465 | - |
dc.description | Includes bibliographical references (p. 59). | en_US |
dc.description | Supervised by Dr. Najib Gerges. | en_US |
dc.description.statementofresponsibility | by Nancy Sleiman, Salim Al Azar | en_US |
dc.format.extent | x, 60 p. ;30 cm +1 CD-Rom (4 3/4 in.) | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | Project management--Case studies | en_US |
dc.title | Applying project management principles on a construction project | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Engineering Management | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2011-03-16 | - |
dc.description.degree | MS in Engineering Management | en_US |
dc.description.status | Unpublished | en_US |
dc.identifier.OlibID | 109727 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.