Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/3445
DC FieldValueLanguage
dc.contributor.advisorSemaan, Nabilen_US
dc.contributor.authorSaeed, Chazaen_US
dc.date.accessioned2020-12-23T14:36:08Z-
dc.date.available2020-12-23T14:36:08Z-
dc.date.issued2018-
dc.identifier.urihttps://scholarhub.balamand.edu.lb/handle/uob/3445-
dc.descriptionIncludes bibliographical references (p. 52-59).en_US
dc.descriptionSupervised by Dr. Nabil Semaan.en_US
dc.description.statementofresponsibilityby Chaza Saeeden_US
dc.format.extentv, 59 p. :ill., tables ;30 cmen_US
dc.language.isoengen_US
dc.rightsThis object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holderen_US
dc.subject.lcshEngineering designen_US
dc.titlePreliminary stochastic schedule estimate for design phase of projectsen_US
dc.typeProjecten_US
dc.contributor.departmentDepartment of Engineering Managementen_US
dc.contributor.facultyFaculty of Engineeringen_US
dc.contributor.institutionUniversity of Balamanden_US
dc.date.catalogued2018-12-21-
dc.description.degreeMS in Engineering Managementen_US
dc.description.statusPublisheden_US
dc.identifier.ezproxyURLhttp://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-EM-34.pdfen_US
dc.identifier.OlibID187920-
dc.provenance.recordsourceOliben_US
Appears in Collections:UOB Theses and Projects
Show simple item record

Record view(s)

41
checked on Nov 21, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.