Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/3445
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Semaan, Nabil | en_US |
dc.contributor.author | Saeed, Chaza | en_US |
dc.date.accessioned | 2020-12-23T14:36:08Z | - |
dc.date.available | 2020-12-23T14:36:08Z | - |
dc.date.issued | 2018 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/3445 | - |
dc.description | Includes bibliographical references (p. 52-59). | en_US |
dc.description | Supervised by Dr. Nabil Semaan. | en_US |
dc.description.statementofresponsibility | by Chaza Saeed | en_US |
dc.format.extent | v, 59 p. :ill., tables ;30 cm | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | Engineering design | en_US |
dc.title | Preliminary stochastic schedule estimate for design phase of projects | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Engineering Management | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2018-12-21 | - |
dc.description.degree | MS in Engineering Management | en_US |
dc.description.status | Published | en_US |
dc.identifier.ezproxyURL | http://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-EM-34.pdf | en_US |
dc.identifier.OlibID | 187920 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.