Please use this identifier to cite or link to this item:
https://scholarhub.balamand.edu.lb/handle/uob/3078
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Hakam, Nidal | en_US |
dc.contributor.author | Kasti, Mohamad Said El | en_US |
dc.contributor.author | Baytiye, Rola | en_US |
dc.date.accessioned | 2020-12-23T14:33:10Z | - |
dc.date.available | 2020-12-23T14:33:10Z | - |
dc.date.issued | 2005 | - |
dc.identifier.uri | https://scholarhub.balamand.edu.lb/handle/uob/3078 | - |
dc.description | Includes bibliographical references (p. 76). | en_US |
dc.description | In separate folder: 8 Appendix. | en_US |
dc.description | Supervised by Dr. Nidal Hakam. | en_US |
dc.description.statementofresponsibility | by Mohamad Said El-Kasti, Rola Baytiye | en_US |
dc.format.extent | ix, 78 p. :ill., tables ;30 cm +1 CD-Rom (4 3/4 in.) | en_US |
dc.language.iso | eng | en_US |
dc.rights | This object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holder | en_US |
dc.subject.lcsh | Production scheduling | en_US |
dc.subject.lcsh | Rasha Center--Production scheduling | en_US |
dc.subject.lcsh | Primavera project planner (P3) | en_US |
dc.title | Construction scheduling and control of the "Rasha Center", Tripoli, Lebanon | en_US |
dc.type | Project | en_US |
dc.contributor.department | Department of Civil Engineering | en_US |
dc.contributor.faculty | Faculty of Engineering | en_US |
dc.contributor.institution | University of Balamand | en_US |
dc.date.catalogued | 2006-03-02 | - |
dc.description.degree | MS in Civil Engineering | en_US |
dc.description.status | Unpublished | en_US |
dc.identifier.OlibID | 71518 | - |
dc.provenance.recordsource | Olib | en_US |
Appears in Collections: | UOB Theses and Projects |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.