Please use this identifier to cite or link to this item: https://scholarhub.balamand.edu.lb/handle/uob/3063
DC FieldValueLanguage
dc.contributor.advisorGerges, Najib N.en_US
dc.contributor.authorIbrahim, Fredericen_US
dc.contributor.authorHayek, Danielen_US
dc.date.accessioned2020-12-23T14:33:04Z-
dc.date.available2020-12-23T14:33:04Z-
dc.date.issued2012-
dc.identifier.urihttps://scholarhub.balamand.edu.lb/handle/uob/3063-
dc.descriptionIncludes bibliographical references (p. 35).en_US
dc.descriptionSupervised by Dr. Najib Gerges.en_US
dc.description.abstractThe purpose of this study is to tackle an important method in the scheduling of a project, crashing a schedule. Crashing the schedule has proved to be a time consuming manual task and susceptible to errors. A need for a clear algorithm is vital as well as implementing this algorithm in a programmed software. This report starts with an introduction about the subject and an explanation about the process of manual crashing as well as previous attempts to tackle the subject. Then, it fragments the manual method of crashing into single operations. Each of those operations is analyzed for programmability and a list of programmable tasks is determined. A general algorithm is then stated, and it is programmed in JavaScript along with a user friendly web interface. An example of a new project and another for an ongoing project are then crashed manually and by the software, and the results are compared.en_US
dc.description.statementofresponsibilityby Frederic Ibrahim, Daniel Hayeken_US
dc.format.extentviii, 89 p. :ill., tables ;30 cmen_US
dc.language.isoengen_US
dc.rightsThis object is protected by copyright, and is made available here for research and educational purposes. Permission to reuse, publish, or reproduce the object beyond the personal and educational use exceptions must be obtained from the copyright holderen_US
dc.subject.lcshProject managementen_US
dc.subject.lcshScheduling (Management)en_US
dc.titleCrashing a schedule an algorithmic and programming approachen_US
dc.title.alternativeCrashing a schedule an algorithmic & programming approachen_US
dc.typeProjecten_US
dc.contributor.departmentDepartment of Civil Engineeringen_US
dc.contributor.facultyFaculty of Engineeringen_US
dc.contributor.institutionUniversity of Balamanden_US
dc.date.catalogued2012-07-04-
dc.description.degreeMS in Civil Engineeringen_US
dc.description.statusPublisheden_US
dc.identifier.ezproxyURLhttp://ezsecureaccess.balamand.edu.lb/login?url=http://olib.balamand.edu.lb/projects_and_theses/GP-Civ-104.pdfen_US
dc.identifier.OlibID127803-
dc.provenance.recordsourceOliben_US
Appears in Collections:UOB Theses and Projects
Show simple item record

Record view(s)

47
checked on Nov 21, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.